You don’t have to look far today to see examples of
metal building systems. Your grocery
store or mega-store, office or factory, riding arena or sports arena,
nursing home or place of worship could be a metal building system. You may
have a garage, shop or even your home that is an example of a pre-fab or
pre-engineered metal building.
But what goes into the planning and design of these structures? And why
should I have to understand this before I purchase a metal building kit?
It is important that you understand the metal building system process to
avoid problems or issues down the road.
First off it’s important to note that the metal building industry is very
competitive. Each company is trying to entice you to buy from them in any
way that they can.
Price is often the main question asked by a potential purchaser and the
metal building manufacturers are keenly aware of that. These companies
look for the best pricing that they can provide you.
In order to accomplish this they economize their design. By that we mean
that they design to the minimal safe structural plan possible for your
building. That means that there is a minimum amount of steel by weight in
their design.
You see, the price of the building is largely based on the cost of the
steel. Steel is priced by weight so the cost can be reduced by reducing
the amount of steel in the building.
Now this isn’t an issue in terms of safety or use – providing that you
have given the dealers or manufacturers all of the important information
about the location and use of your metal building kit. All reputable metal
building manufacturers construct their buildings to suit the building
codes for the specific construction location.
That means for example, that you need to inform the dealers that you
intend to place an HVAC unit on the roof at these specific locations. And
these units will weigh X pounds.
If you plan on attaching a chain hoist or other type of overhead lifting
device to the members of the metal building system, the manufacturer has
to design the point loads for this process into their structural analysis.
Even attaching loads to the columns of the building must be designed for.
Mezzanines, braces for racking even unit heaters that are mounted on the
columns (or rafters) need to be accounted for.
If you are dealing with a dealer/contractor such as the dealer network
that
Robertson Building Systems has, your contractor will ensure that all
of the required loads will be provided to the manufacturer. All you need
to do is to provide him with your intended use and any potential add-ons
for whatever activities that the metal building will accommodate.
This article is not meant to scare you off from buying a metal building
but rather to re-assure you that if the planning is completed correctly,
you can have a very economical metal building system that meets or exceeds
your specific requirements.
What to Do Next
· Check out the other articles relating to metal stud panelized building kits and residential building packages on our Metal Building Kits Articles Map
New Series! How To Plan and Build Your New Metal Building Kit!
Webmasters, submit your site to for possible inclusion in our directory.
Share this site by pasting this code on your site.
Read our terms of use and privacy statements.
Our Disclosure Policy.
Visit our partner listings.
For quick browsing of our site visit our site map.